TM 55-1520-240-23-3
3-51
INSTALL UPPER DRAG LINK
(Continued)
3-51
6.
Place support blocks (13) on drag link (1).
7.
Untie hydraulic tubes. Place tubes (14, 15, and
16) on support blocks (13). Secure to support
blocks with two clamps (17).
8.
Connect rod end (18). Use washer (19) and nut
(20). Torque nut to 290 to 410 inch-pounds.
Install cotter pin (21).
9.
Connect switch rod end (22) to drag link (1), with
washer (23), spacer (24), bolt (25), and nut (26).
10.
Check adjustment of switch (Task 3-56).
11.
Remove chock blocks from wheel.
INSPECT
FOLLOW-ON MAINTENANCE:
Lower and remove jack (Task 1-24).
END OF TASK
3-133