TM 55-1520-240-23-10
16-8.1
INSTALL CENTER CARGO HOOK
(Continued)
16-8.1
Dry ice (E92) in methanol (E243) has
a temperature of -120ºF -84.4ºC.
Observe all safety measures working
with dry ice (E92) and methanol
(E243) and when handling chilled
parts. Avoid breathing carbon dioxide
vapor.
Wear Kevlar gloves (E187)when
handling chilled bearings or heated
yoke.
NOTE
Guard was temporarily installed to
prevent loss of hardware.
1.
Remove two bolts (1), washers (2), and clamps
(3) from guard (4). Remove four washers (5)
from behind guard.
2.
Remove two bolts (6) and washers (7) from
guard (4). Remove four washers (8) from behind
guard. Remove guard.
3.
Place sleeve spacer (9) in a solution of dry ice
(E92) and methanol (E243). Wear goggles
and Kevlar gloves (E187). Allow spacer to chill
thoroughly.
4.
Have helper support hook (10), open end
forward, at support beam (11).
5.
Align holes in hook (10) and support beam (11).
6.
Remove spacer (9) from solution and wipe clean
and dry. Use cloth (E120). Wear goggles and
Kevalr gloves (E187).
7.
Install spacer (9) through holes in hook (10) and
support beam (11).
16-81
