• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALL AFT FUSELAGE IDLER BELLCRANKS     (Continued) - TM-55-1520-240-23-9_978
REMOVE AFT FUSELAGE  BELLCRANK (FWD SIDE  STA 482 BULKHEAD) (Continued)

TM-55-1520-240-23-9 CH-47D Heilcopter Manual
Page Navigation
  945    946    947    948    949  950  951    952    953    954    955  
TM  55-1520-240-23-9 11-248 REMOVE  AFT FUSELAGE BELLCRANK (FWD  SIDE  STA  482 BULKHEAD) 11-248 INITIAL  SETUP Applicable Configurations: All Tools: Aircraft  Mechanic’s Tool  Kit, NSN 5180-00-323-4692 Materials: Paper  Tags  (E264) Twine  (E433) Personnel  Required: Medium  Helicopter Repairer References: TM  1-1520-253-23 Equipment  Condition: Battery Disconnected  (Task  1-39) Electrical  Power Off Hydraulic  Power Off Safety  Blocks  (T31)  Installed  (Task  11-28) Servocylinder Connecting  Links  Disconnected  (Task 11-192) Pylon  Doors  Open  (Task 2-2) NOTE If  a  crack  in  the  connecting  link, bellcrank,  or  support  stage  is suspected  during  removal,  refer to  TM 1-1520-253-23. 1. Tag  bellcrank (1). 2. Remove  cotter  pin  (2), nut (3), washers  (4),  and bolt  (5). 3. Disconnect connecting  link  (6) from  bellcrank  (1). Tie link out of way of bellcrank.  Use  twine  (E433). 4. Install  bolt  (5),  washers  (4),  and  nut  (3)  in bellcrank  (1). 5. Remove  cotter  pin  (7), nut (8), washers  (9),  and bolt  (10). 6. Disconnect connecting  link  (11)  from  bellcrank (12). 7. Install  bolt  (10),  washers  (9),  and  nut  (8)  in bellcrank  (12). 11-963







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.