INSTALL PYLON  LEFT UPPER CONNECTING  LINK
INSTALL PYLON  LEFT UPPER  CONNECTING LINK (Continued)

TM-55-1520-240-23-9 CH-47D Heilcopter Manual
Page Navigation
  978    979    980    981    982  983  984    985    986    987    988  
TM  55-1520-240-23-9 11-261 INSTALL  PYLON LEFT UPPER  CONNECTING LINK (Continued) 11-261 1. Working  from  pylon  left  work platform,  remove nut (1), two  washers  (2  and  3), and  bolt  (4)  from bellcrank  (5). FLIGHT  SAFETY PARTS This  is  an  installation  critical  flight safety part.  All aspects of its assembly and  installation  must be  ensured. Ensure  that  both  rod  end  jam  nuts are installed  and  torqued. Ensure  that  the  rivet  through  the  fixed rod  end  bearing  is secure. Ensure  proper  attaching  hardware (impedance  type  bolt,  nut,  and washers)  is  installed  including verification  of  bolt  head  orientation, torque,  and  installation  of cotter  pins. Loose attachments within  flight control primary  linkage  will  degrade  aircraft control.   Missing  components  will cause  loss of control. 2. Insert  connecting  link  (6)  through  hole  (7)  in upper structure  and  hole  (8) in  lower structure. Position  link  in  bellcrank  (5). 3. Install  bolt  (4),  two  washers  (3  and  2),  and  nut (1)  in  bellcrank  (5). 4. Torque  nut  (1) to  60 to 90 inch-pounds.  Install cotter  pin  (11). 5. Working  from  ramp,  remove  nut  (10),  two washers (11  and  12), and bolt (13) from bellcrank (14). 6. Position  link  (6)  in  bellcrank  (14).   Install  bolt (13),  two  washers  (12  and  11),  and  nut (10) in bellcrank. 11-996







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.