• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALL PYLON  RIGHT LOWER  BELLCRANK  STA  534 (Continued)
INSTALL PYLON  LEFT UPPER CONNECTING  LINK

TM-55-1520-240-23-9 CH-47D Heilcopter Manual
Page Navigation
  976    977    978    979    980  981  982    983    984    985    986  
TM  55-1520-240-23-9 11-260 REMOVE  PYLON  LEFT UPPER  CONNECTING  LINK 11-260 INITIAL  SETUP Applicable  Configurations: All Tools: Aircraft Mechanic’s  Tool  Kit,  NSN  5180-00-323-4692 Workstand Materials: None Personnel  Required: Medium  Helicopter  Repairer References: TM  1-1520-253-23 Equipment  Condition: Battery Disconnected  (Task  1-39) Electrical  Power  Off Hydraulic  Power  Off Safety  Blocks  (T31)  Installed  (Task  11-28) Cargo  Ramp  Open  and  Level  (Task  2-2) Pylon  Left  Work  Platform  Open  (Task 2-2) NOTE Attaching  bolt,  washers,  and  nut will be  temporarily installed  after  removing links. NOTE If  a  crack  in  the  connecting  link  or bellcrank is suspected during  removal, refer  to  TM  1-1520-253-23. 1. Working  from ramp, remove  cotter  pin  (1), nut (2), two  washers  (3),  and  bolt (4)  from  bellcrank (5). Disconnect  left connecting  link (6)  from  bellcrank. 2. Install  bolt  (4),  two  washers  (3),  and  nut  (2) loosely  in  bellcrank  (5). 3. Work  from  left work  platform, remove  cotter  pin (7),  nut  (8),  two  washers (9), and  bolt  (10)  from bellcrank (11).   Remove  link  (6). 4. Install  bolt  (10),  two  washers  (9),  and  nut  (8) loosely  in  bellcrank  (11). FOLLOW-ON  MAINTENANCE: None END  OF  TASK 11-994







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.