TM 55-1520-240-23-7
9-121
INSTALL TROOP WARNING BOX
9-121
INITIAL SETUP
Applicable Configurations:
All
Tools:
Electrical Repairers Tool Kit, NSN 5180-00-323-4915
Soldering Gun
Materials:
Cement (E107)
Solder (E360)
Pile Tape (E402)
Gloves (E186)
Personnel Required:
Aircraft Electrician (2)
Inspector
References:
TM 55-1520-240-23P
NOTE
Procedures are similar for installing
forward or aft box. Forward box is
shown here. When installing aft box
(sta. 575), do not perform steps 4 and
5. Parts installed in steps 4 and 5 are
installed in forward box only.
1.
Position box (1) and install screw (2), washer (3),
spacer (3.1) between box and structure, washer
(3), and nut (4) in four places.
9-462