• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALL CLAMP  MOUNTED  INSTRUMENTS  IN  MAINTENANCE  PANEL (Continued)
REMOVE  HYDRAULIC  MAINTENANCE  PANEL COMPONENTS

TM-55-1520-240-23-7 CH-47D Heilcopter Manual
Page Navigation
  293    294    295    296    297  298  299    300    301    302    303  
TM  55-1520-240-23-7 8-99 REMOVE  MAINTENANCE  PANEL 8-99 INITIAL  SETUP Applicable  Configurations: All Tools: Electrical  Repairer’s Tool  Kit, NSN  5180-00-323-4915 Materials: Paper  Tags  (E264) Personnel  Required: Aircraft  Electrician Medium  Helicopter  Repairer Equipment  Condition: Battery Disconnected  (Task  1-39) Electrical  Power  Off Hydraulic  Power  Off Cargo  Ramp  Open  and  Level  (Task  2-2) 1. Tag  and  disconnect  two  wire  harness  connectors (1). 2. Remove  two  screws (2)  and  washers  (3)  from right side  of  maintenance  panel  (4).   Panel  will swing  out. 3. Have  helper  support maintenance  panel  (4). 4. Remove  four  screws (5)  and  washers (6)  from left  side  maintenance  panel  hinges  (7). 5. Remove  maintenance  panel  (4). FOLLOW-ON  MAINTENANCE: None END  OF  TASK 8-308







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.