TM 55-1520-240-23-6
7-11
PREPARE FLIGHT CONTROL HYDRAULIC SYSTEM AFTER FLUSHING (PRESSURE
LINES)
(Continued)
7-11
NO. 1 POWER CONTROL MODULE
7.
Remove test hose (11) and fittings (12) from
pump pressure line (13) and system pressure
line (14). Plug lines.
INSPECT
7-70