TM 55-1520-240-23-6
7-11
PREPARE FLIGHT CONTROL HYDRAULIC SYSTEM AFTER FLUSHING (PRESSURE
LINES)
(Continued)
7-11
NO. 1 PUMP
1.
Remove test stand return line (1) and union (2)
from No. 1 pump pressure line (3). Use gloves
(E186).
2.
Remove cap from pressure port (4) of No. 1
pump (5).
3.
Connect line (3) to pressure port (4).
INSPECT
FORWARD SERVOCYLINDERS
NOTE
Pivoting servocylinder is reached
from right work platform. Swiveling
servocylinder is reached from left
work platform. Pivoting servocylinder
only is shown here.
4.
Remove plugs from pressure hoses (6 and 7) at
both forward servocylinders (8).
5.
Remove four caps from elbows (9 and 10) on
both servocylinders (8).
6.
Connect pressure hoses (6) to elbows (9) and
pressure hoses (7) to elbows (10).
INSPECT
7-69