TM 55-1520-240-23-6
7-218
INSTALL UTILITY RESERVOIR/COOLER
(Continued)
7-218
2.
Position reservoir/cooler (1) on brackets (18).
Install four nuts (19) and washers (20).
3.
Connect tube (21) to RTN port (22). Remove tag.
4.
Connect tube (23) to SPLY port (24). Remove
tag.
5.
Connect tube (25) to port (26). Remove tag.
6.
Connect cable plug (27) to bulb (2). Remove tag.
7.
Connect cable plug (28) to switch (4). Remove
tag.
8.
Connect cable plug (29) to receptacle (30).
Remove tag.
9.
Connect hose (31) to valve (13). Tighten clamp
(32). Remove tag.
10.
Position duct (33) to reservoir/cooler (17).
Tighten clamp (34).
11.
Lockwire clamp (34). Use lockwire (E231).
INSPECT
FOLLOW-ON MAINTENANCE:
Service reservoir (Task 1-60 or 1-63).
Bleed utility hydraulic system (Task 7-336).
Perform operational check (TM 55-1520-240-T).
Close right aft pylon access doors (Task 2-2).
END OF TASK
7-830