TM 55-1520-240-23-6
7-57
INSTALL NO. 1 OR NO. 2 POWER CONTROL MODULE PILOT VALVES
(Continued)
7-57
NOTE
There are two pilot valves, one in No.
1 and one in No. 2 module. Procedure
is same to install any pilot valve. No.
1 module is shown here.
1.
Install valve (1), four retainers (2), and three
packings (3) in SYS PLT V port (4).
2.
Connect connector (5) to valve (1).
3.
Lockwire valve (1) to valve (6). Use lockwire
(E231).
INSPECT
FOLLOW-ON MAINTENANCE:
Service flight control system (Task 1-60, 1-61, 1-62,
or 1-63).
Perform operational check (TM 55-1520-240-T).
Close right forward work platform or right pylon
access door (Task 2-2).
END OF TASK
7-275