INSTALL AFT TRANSMISSION
(Continued)
6-97
NOTE
Oil hoses are reached through
generator access holes on each side
of pylon.
23.
Connect two oil hoses (56 and 57) to reducers
(58 and 59) on top of transmission (1).
NOTE
Connect wires to left and right
generator in same way. Connections
are reached through access holes on
each side of pylon.
24.
Connect electrical connector (60) to generator.
Connect four wires (61) to generator with nuts
(62). Install cover plate (63) with two screws (64).
REMOVE HOIST KIT
25.
Working from cabin, disconnect cables (9) of
forward hoist (15) from two forward lifting lugs
(10) on transmission (1). Working from side of
pylon, disconnect cables of aft hoist from two aft
lifting lugs (11) on transmission (1).
26.
Have helpers operate two hoists (15) to raise
cables (9).
6-371