PREPARE AFT TRANSMISSION FOR SHIPMENT OR STORAGE
(Continued)
6-94
9.
Install transmission (2) in shipping container
(T37) (8) as follows:
a.
Inspect and prepare container (8) (TB
55-8100-200-25).
b.
Connect sling (T163) (9) to four lugs (10).
Connect work hoist chain (11) to sling.
c.
Remove two nuts (12) and bolts (13) from
support bar (14). Remove support bar from
container (8).
d.
With aid of helper, lift transmission (2) into
container (137) (8). Align it with two mounting
brackets (15).
e.
Install support bar (14) on container (8) over
transmission (2). Install two bolts (13) and
nuts (12). Torque nuts to 55 foot-pounds.
f.
Install two bolts (16) and nuts (17) through
brackets (15) of forward end of transmission.
Install two bolts (18) and nuts (19) through
support bar (14) at aft end of transmission
(2). Torque all nuts to 55 foot-pounds.
g.
Remove sling (T163) (9) from transmission
(2).
h.
Install two bolts (13) and nuts (12) through
support bar (14). Torque nuts to 55
foot-pounds.
i.
Prepare required maintenance forms and
reports (DA PAM 738-751 and TB 750-126).
j.
Put five 16-unit bags of desiccant (E160) into
container (T37) (8).
INSPECT
k.
Install cover (20) on container (T37) (8).
Install bolt (21), two washers (22), split
washer (23), and nut (24) at 24 places.
l.
Torque nuts (19) at 3, 6, 9, and 12 oclock
to 275 inch-pounds. Torque nuts at 2, 4, 8,
and 12 oclock. Torque remaining nuts.