• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PLACE SWASHPLATE IN SERVICE     (Continued)
INSTALL FORWARD SWASHPLATE (Continued)

TM-55-1520-240-23-4 CH-47D Heilcopter Manual
Page Navigation
  721    722    723    724    725  726  727    728    729    730    731  
TM 55-1520-240-23-4 5-132 INSTALL FORWARD SWASHPLATE 5-132 INITIAL SETUP Applicable Configurations: All Tools: Aircraft Mechanic’s Tool Kit, NSN 5180-00-323-4692 Controls Sling (T14) Torque Wrench, 30-150 Inch-Pounds Torque Wrench, 100-750 Inch-Pounds Hoist Guide Line Materials: Lockwire (E231) Antiseize Compound (E75) Parts: Cotter Pins Personnel Required: CH-47 Helicopter Repairer (3) Inspector References: TM 55-1520-240-23P Task 5-114 Task 5-114.1 Task 5-115 Task 5-131 NOTE Positive retention bolts are installed in the upper controls.  They have a pawl which prevents nut or bolt removal unless the pawl is depressed (Task 1-14). 1. Install control sling (T14) (1) on swashplate (2) as follows: a. Remove three quick-release pins (3). b. Position three links (4) on lugs (5). c. Install pins (3). 2. Attach hoist chain (6) to sling (T14) (1). 3. Attach guide line (7) to swashplate (2). 5-726 Change 2







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.