TM 55-1520-240-23-3
4-10.1
REMOVE POWERPLANT
(Continued)
4-10.1
24.
Remove engine transmission (18) from
powerplant (1) (Task 6-100). Go to Follow-On
Maintenance.
REMOVE POWERPLANT WITH ENGINE
TRANSMISSION REMOVED
25.
Perform steps 1 thru 6 and 9, then go to step 26.
26.
Install sling (23) as follows:
a.
Open access door (24) in engine access
cover (25).
b.
Connect two cables (26) to forward fittings
(27) on powerplant (1).
c.
Connect cable (28) into aft fitting (29) through
cover (25).
d.
Adjust sling (23) until eye (30) is over aft hole
(31) in sling bar (32).
e.
Install pin (33) through bar (32).
27.
Perform steps 12 thru 22. Go to Follow-On
Maintenance.
FOLLOW-ON MAINTENANCE:
Record any accumulated Emergency Power Time in
DA Form 2408-15.
Perform AT TIME OF ENGINE REMOVAL FOR ANY
REASON inspection (Task 1-92).
Download the DECU (Task 4-149).
END OF TASK
4-58