• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
1-40 INSTALL HOISTING  UNIT (Continued) - TM-55-1520-240-23-1_168
1-40 INSTALL HOISTING  UNIT (Continued) - TM-55-1520-240-23-1_170

TM-55-1520-240-23-1 UH-1H/V and EH-1H Aircraft Manual
Page Navigation
  133    134    135    136    137  138  139    140    141    142    143  
TM  55-1520-240-23-1 1-40 INSTALL  HOISTING UNIT (Continued) 1-40 30. Remove  hook  (44)  from  stowed  position. 31. Turn  azimuth  control handle  (36)  and  position  jib boom  (37)  over  right  side  of  helicopter. 32. Turn  winch  handle  (45)  DOWN  and  lower  hook (44)  about  three  feet  from  ground.    Down direction  is  indicated  on  winch  handle  (46). 33. Have  helpers  position  mast  and  boom  (47)  on ground  beside  helicopter  under  jib  boom  with trolley  and  hook  (48)  forward. 34. Attach  rope  guide  lines  (49)  to  both  ends  of  mast and  boom  (47). 35. Attach jib  boom  hook  (44)  to  bracket  (50)  on  mast and  boom  (47).  If  hook  does  not  fit,  use  a  nylon or  wire  cable  loop  between  hook  and  bracket. Raise  mast  and  boom  slowly  and carefully  to  prevent  damage  which otherwise  might  result  from  mast  and boom  hitting  helicopter. 36. Hoist  (raise)  mast  and  boom  (47)  above helicopter.   Have  two  helpers  guide  mast  and boom  with  guidelines  (49). 37. Rotate  jib  boom (37)  with  azimuth  control handle (36)  until  mast  and  boom  (47)  is  positioned directly  over  center  of  fuselage  (2). 1-144







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.