• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
1-40 INSTALL HOISTING  UNIT (Continued) - TM-55-1520-240-23-1_173
1-41 REMOVE  HOISTING UNIT (Continued) - TM-55-1520-240-23-1_175

TM-55-1520-240-23-1 UH-1H/V and EH-1H Aircraft Manual
Page Navigation
  138    139    140    141    142  143  144    145    146    147    148  
TM  55-1520-240-23-1 1-41 REMOVE  HOISTING  UNIT 1-41 INITIAL  SETUP Applicable Configurations: All Tools: Aircraft  Mechanic’s Tool  Kit, NSN  5180-00-323-4692 Workstand Materials: Rope  Guidelines  (2) Personnel  Required: Medium  Helicopter  Repairer  (5) Inspector NOTE Procedure  is  similar  for  removing unit  at  forward  and  aft  positions. Differences  are  noted  in  task  steps. Forward  removal  is shown  here. Cable  will  tangle  if  slack  is not  taken up  when  mast  and  boom  are  raised. 1. Take  up  slack  in  cable  (1)  by  turning  hook  winch handle  (2)  in  UP  direction. 2. Position  trolley (3)  at end  of boom  (4)  by turning trolley  winch  handle  (5)  in  OUT  direction. 3. Remove  quick-release  pin  (6)  from  mast (7)  and upper  tube  (8). 4. Remove  quick-release  pin  (9)  from  mast (7)  and tension  rod  (10). 1-149







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.