TM 55-1520-240-23-9
11-280
AFCS INTERFACE TEST
(Continued)
11-280
TEST 12
LATERAL (ROLL) CPT NULL AND OUTPUT TEST
(BOTH)
67.
Set AFCS SYSTEM SEL switch (1) to 1 or 2.
(System under test.)
68.
Set METER SOURCE switch (3) to CPT
MONITOR.
69.
Set CPT MONITOR switch (31) to LATERAL.
Read digital (6). Reading shall be -0.05 to +0.05
VAC.
70.
Remove yoke (28) from control stick (32).
71.
Move control stick (32) full right. Read digital
display (6). Reading shall be +4.0 to +6.0 VAC.
72.
Move control stick (32) full left. Read digital
display (6). Reading shall be -4.0 to -6.0 VAC.
END ROLL CPT NULL AND OUTPUT TEST (BOTH)
11-1185