TM  55-1520-240-23-8
10-120
TEST  FUEL  FEED SYSTEM
(Continued)
10-120
29.
Close  valves  (24  and  26).  Open  valve  (24.1) and
regulate  pressure  to  60 psi.  Open  valve  (24) and
stabilize  pressure  to  60 psi on  gage  (25).  Close
valve  (24).
30.
Wait 5  minutes  and  check  gage  (25).  If  gage
indicates  60 psi, go  to  step  32.  If  gage  does  not
indicate  60 psi,  go  to  step  31.
CHECK  FOR LEAKS  BETWEEN SHUTOFF VALVE
AND  NO.  1  ENGINE
31.
Check  for leaks  as follows:
a.
Check  connectors  between  shutoff valve  (40)
and  No.  1  engine  (14).  Use  soap  and  water
mixture  as  in  step  18a.
b.
Check  tubing,  hoses,  and  fittings  between
shutoff  valve  (40) and  No.   1  engine  (14).
Refer  to  TM  1-1500-204-23.
10-538