TM 55-1520-240-23-8
10-117
PRESSURE TEST VENT SYSTEM
(Continued)
10-117
11.
Remove plug (E55) (5.1) from port (6). Install
packings (4 and 5) on drain valve (3). Install
drain valve in port.
INSPECT
12.
Remove plug from hose (2). Connect hose
to fitting (1). Torque connection to 1150
inch-pounds.
FOLLOW-ON MAINTENANCE:
Install forward access door on main or aft tank (Task
10-52 or 10-80).
Install aft access door on forward tank (Task 10-25).
END OF TASK
10-503