TM 55-1520-240-23-7
8-22.2
INSTALL NO. 1 OR NO. 2 TORQUE SIGNAL PROCESSOR/POWER SUPPLY
(Continued)
8-22.2
NOTE
The procedure is the same to install
the No. 1 or No. 2 torque signal
processor/power supply. The No. 1
torque signal processor/power supply
is shown here.
1.
Put on gloves (E184.1).
2.
Clean bonding surfaces of torque signal
processor/power supply (1). Use aliphatic
naphtha (E245) and cloths (E120).
3.
Put torque signal processor/power supply (1)
over mounting holes (2).
4.
Install four screws (3) and washers (4).
5.
Connect electrical connectors (5). Remove
paper tags.
FOLLOW-ON MAINTENANCE:
Perform an operational check of engine torque
indicating system (TM 55-1520-240-T).
END OF TASK
8-71/(8-72 blank)