TM 55-1520-240-23-7
9-11
INSTALL POWER DISTRIBUTION PANEL (PDP) CIRCUIT BREAKERS
(Continued)
9-11
NOTE
Procedure to install push-pull type
circuit breakers on No. 1 and No. 2
PDP is the same. Removal of CONT
CENTER circuit breaker on No. 1
PDP is shown here.
1.
Position circuit breaker (1) in panel (2). Install
nut (3).
2.
Position bus bar (4) on circuit breaker (1). Install
screw (5).
3.
Remove tape and connect two wires (6) by
installing two washers (9) and two screws (7).
Remove tags.
INSPECT
9-44