TM  55-1520-240-23-7
8-108
INSTALL CENTER  INSTRUMENT PANEL
(Continued)
8-108
6.
Reach  behind  panel  (1)  and  position  three
switches  (14) in  panel  (1).  Install  three  nuts (15)
and  washers  (16).
7.
Position  light plate  (17)  on  panel  (1).   Install  two
screws  (18).   Without   17  ,  install  two  lens  caps
(19).
8.
Without   17  ,  reach  behind  panel  (1) and  solder
wires to  each  of two  light  sockets  (20).
9.
With   17 , reach  behind panel (1) and  screw wires
onto  light  socket  (21).
10.
Reach  behind  panel  (1) and  position  two  light
bases  (22) in  panel  (1).  Install  two  nuts  (23) and
washers  (24)  on  light  bases.
11.
Install  two  lamps (25)  in  two  lenses  (26).  Install
lenses  in  two  light bases  (22).
INSPECT
FOLLOW-ON MAINTENANCE:
Install  clamp  mounted  instruments  in  center panel
(Task  8-87).
Install master caution  panel (Task 9-131).
Install  caution  lights  and  VHF  switch  panel  (Task
9-133).
Install  fire  pull  control  (Task  12-18).
Install  fire  agent switch  (Task  12-20).
Perform  operational  check  of  affected  systems  (TM
55-1520-240-T).
END  OF  TASK
8-353