TM  55-1520-240-23-6
7-254
INSTALL  HOIST PRESSURE  RELIEF VALVE
(Continued)
7-254
3.
Position  valve  (2)  on  structure  (5),  clamp  (1)
pointing  aft and  arrow  (6)  up.  Connect  two  tubes
(7  and  8)  to  valve.
4.
Install  screw  (9)  and  washer  (10)  in  clamp  (1)
and  structure  (5).
INSPECT
FOLLOW-ON  MAINTENANCE:
Service  utility hydraulic  system  (Task 1-59  or  1-62).
Perform   operational  check  of   hoist  (TM
55-1520-240-T).
Install  heater  compartment  acoustic  blanket  (Task
2-210).
END  OF  TASK
7-934