TM  55-1520-240-23-5
6-94
PREPARE AFT TRANSMISSION FOR SHIPMENT OR  STORAGE
(Continued)
6-94
10.
Remove  plug  (25)  from  cover  (20).
11.
Connect  air  test  line  (26)  to  cover  (20).
Low  pressure  air  supply  must  be
used.   Exceeding  test pressure  can
damage  container.
12.
Pressurize  container  (8)  to  3 psi  max.   Check
container  for  leaks.   Container  must  hold  3 psi
for 1  hour.
Be  careful  when  releasing  air  under
pressure,  wear  goggles.   Personal
injury  can  result.
13.
Push  pressure  relief  valve  (27)  until pressure  in
container  (8)  is 0  psi.
14.
Disconnect  air  line  (26)  from  cover  (20).
15.
Install  plug  (25)  in  cover  (20).
FOLLOW-ON  MAINTENANCE:
None
END  OF  TASK
6-358