TM 55-1520-240-23-3
4-86
REMOVE BLEED BAND ACTUATOR
4-86
INITIAL SETUP
Applicable Configurations:
All
Tools:
Powerplant Repairers Tool Kit, NSN
5180-00-323-4944
Materials:
None
Personnel Required:
Aircraft Powerplant Repairer
References:
TM 55-2840-254-23 Without 74
TM 1-2840-265-23 With 74
Equipment Condition:
Battery Disconnected (Task 1-39)
Electrical Power Off
Engine Work Platform Open (Task 2-2)
Engine Access Cover Open (Task 4-49)
Do not pinch, crush, kink, or make
sharp bends in fire detection element.
Element can be damaged.
NOTE
Procedure is same to remove bleed
band actuator from No. 1 or No. 2
powerplant. Removal of No. 2 bleed
band is shown here.
1.
Turn three fasteners (1) counterclockwise and
release element (2) and bushing (3) from three
clamps (4). Move element to side.
4-337