TM 55-1520-240-23-11
MAINTENANCE ALLOCATION CHART
Section II
NOMENCLATURE OF END ITEMS
(1)
(2)
(3)
(4)
(5)
(6)
Maintenance Category
Group
Number
Component/Assembly
Maintenance
Function
AVUM
AVIM
DEPOT
Tools and
Equipment Remarks
1122
Connecting Links, Between Second
Stage and Forward Servocylinders
Inspect
-.-
274
Adjust
-.-
278
Replace
-.-
278, 282
Repair
-.-
282
1123
Connecting Links Between First and
Second Stage Mixing
Inspect
-.-
274
Adjust
-.-
278
Replace
-.-
278, 282
Repair
-.-
282
1124
Bellcrank, Transfer Pitch, Thrust,
Roll, and Yaw
Inspect
-.-
Replace
-.-
T128, 278,
282
Repair
-.-
278
112401
Bellcrank Support
Replace
-.-
278, 282
1125
Yoke Assemblies, Longitudinal Cyclic
Trim
Inspect
-.-
274, 278
Replace
-.-
231, 278,
282
Repair
-.-
221, 236,
242, 274,
278
1126
Tunnel Control Arms and Idlers
Inspect
-.-
Replace
-.-
T44, T135,
278, 282
Repair
-.-
278
1127
Connecting Links Between Second
Stage and Aft Servocylinders
Inspect
-.-
274
Adjust
-.-
T44, T135,
278, 282
Replace
-.-
T44, T135,
278, 282
Repair
-.-
278, 282
B-70