TM 55-1520-240-23-10
16-95
INSTALL INCLINOMETER SENSOR
(Continued)
16-95
ADJUST INCLINOMETER
4.
Level aircraft (Task 1-21).
5.
Connect battery (Task 1-39) and apply aircraft
electrical power.
6.
Apply power to head up display system and
check for proper operation (TM 55-1520-240-T).
7.
While utilizing the ANVIS HUD goggles with
appropriate filters for lighting conditions, view
turn and bank indicator ball. If turn and bank
indicator ball is centered, go to step 14. If
position of turn and bank indicator ball is not
centered, go to step 8.
8.
Turn off head up display system.
9.
Turn off aircraft power and disconnect battery
(Task 1-39).
10.
Remove inclinometer (Task 16-94).
NOTE
The inclinometer is level when the turn
and bank indicator ball is centered in
the ANVIS HUD goggles. One shim
will shift the turn and bank indicator
ball approximately one-tenth of its
diameter.
11.
Insert shim(s) as required under inboard or
outboard end of inclinometer, in the direction of
error.
12.
Install inclinometer steps 1 thru 3.
13.
Repeat steps 5 thru 12 until turn and bank
indicator ball is centered in head up display.
14.
Turn off head up display.
15.
Turn off aircraft power and disconnect battery
(Task 1-39).
16.
Lower aircraft (Task 1-21).
INSPECT
FOLLOW-ON MAINTENANCE:
Install Amplifier-Coupler (TM 11-1520-240-23).
Install Receiver-Transmitter (TM 11-1520-240-23).
Install KY-75 Processor (TM 11-1520-240-23).
Install IFM Amplifier (TM 11-1520-240-23).
Install Electronic Compartment Acoustic Blanket
(Task 2-107).
NO BREAK - WORK HARDER
NO BREAK - WORK HARDER
NO BREAK - WORK HARDER
NO BREAK - WORK HARDER
NO BREAK - WORK HARDER
NO BREAK - WORK HARDER
NO BREAK - WORK HARDER
NO BREAK - WORK HARDER
NO BREAK - WORK HARDER
NO BREAK - WORK HARDER
NO BREAK - WORK HARDER
NO BREAK - WORK HARDER
NO BREAK - WORK HARDER
NO BREAK - WORK HARDER
NO BREAK - WORK HARDER
NO BREAK - WORK HARDER
NO BREAK - WORK HARDER
NO BREAK - WORK HARDER
Tasks 16-96 Deleted.
END OF TASK
16-344
