TM 55-1520-240-23-1
1-47
ASSEMBLE HOISTING UNIT BOOM
(Continued)
1-47
23.
Position link (52) in boom (5). Check that gap
between link and boom is less than 0.02 inch. If
gap is more than 0.02 inch, install a maximum
of two washers (53) on each side of link to close
gap.
24.
Install bolt (54), two washers (55), and nut (56).
25.
Align holes in link (52) and tension rod (57).
Install bolt (58), two washers (59), nut (60), and
cotter pin (61).
26.
Position spacer (62) and two washers (63) in
boom (5). Check that gap between washers
and boom is less than 0.02 inch. If gap is more
than 0.02 inch, install washers (64) as needed
to close gap.
27.
Install spacer (65).
1-178