TM 55-1520-240-23-9
11-245
INSTALL AFT FUSELAGE CONNECTING LINKS
(Continued)
11-245
FOLLOW-ON MAINTENANCE:
Connect servocylinder connecting links (Task
11-193).
Remove safety blocks (Task 11-29).
Perform neutral rig check (Task 11-33).
Perform functional test of tunnel flight controls (TM
55-1520-240-T).
Close tunnel access covers (Task 2-2).
Close pylon doors (Task 2-2).
Close cargo ramp (TM 55-1520-240-T).
END OF TASK
11-956