TM 55-1520-240-23-9
11-236
REMOVE TUNNEL CONNECTING LINKS
(Continued)
11-236
4.
At sta. 241, remove nut (8), two washers (9), bolt
(10), and electrical lead (11).
5.
Remove cotter pin (12), nut (13), washers (14),
and bolt (15) from links (16 and 17) and control
arm (18).
6.
Disconnect connecting links (16 and 17).
7.
Without 38 , if connecting links (16 and 17) are
to be replaced, remove clamp (19).
7.1.
With 38 , if connecting links (16 and 17) are to
be replaced, leave clamp (19) with link.
8.
At sta. 401 remove cotter pin (20), nut (21),
washers (22), and bolt (23) from connecting link
(24 and 25) and control arm (26).
9.
Disconnect connecting links (24 and 25).
FOLLOW-ON MAINTENANCE:
None
END OF TASK
11-921