• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALL TUNNEL FORWARD  CONNECTING LINKS (Continued) - TM-55-1520-240-23-9_934
REMOVE  TUNNEL CONNECTING  LINKS

TM-55-1520-240-23-9 CH-47D Heilcopter Manual
Page Navigation
  903    904    905    906    907  908  909    910    911    912    913  
TM  55-1520-240-23-9 11-235 INSTALL TUNNEL FORWARD  CONNECTING LINKS (Continued) 11-235 13. Without   38  ,  if  connecting  link  (1)  has  been repaired  or  replaced,  position  clamp  (23) as follows: a. Measure  6.2  inches  from  center  of  bolt (10)  in  rod  end  to  non-tapered  surface  on connecting  link  (1). b. Remove  finish  from  non-tapered  surface  of link  (1) with  fine  grit abrasive  paper  (E11). Make  sure  finish  only is  removed.  No  metal shall  be  removed. c. Position  clamp  (23)  on  link (1). 14. Without   38  , install electrical  lead  (24), bolt (25), two  washers (26), and  nut (27) on  clamp  (23). 15. Without   38  ,  apply  alodine  (E65)  on  all  bare metal  surfaces.   Allow to  dry thoroughly.   Wear gloves  (E184.1). 16. Without   38  ,  apply  epoxy  primer (E292.1) to  all bare  surfaces  coated  with  alodine  (E65).   Wear gloves  (E184.1). INSPECT 17. With   38  ,  clean  inside  diameter of clamp  (23) and  clamp  location  on  link.   Use  dry  cleaning solvent (E162).  Wear  gloves  (E184.1). NOTE Clamp  (23) is  to  be  positioned  on  full outer diameter of  link.  Not  on  taper end. 18. With   38  , position  clamp  (23) on  end  of  full O.D. of  link  (1). 19. With   38  , install electrical  lead  (24), bolt (25), two washers  (26),  and  nut (27)  on  clamp  (23). 20. With   38  ,  seal  clamp  (23) edge  around  O.D.  of link with  sealant  (E342.1).  Wear gloves (E184.1). Allow  sealant to  air dry for a  minimum  of  6 hours at 70º  to  80ºF  (21º  to 27ºC). FOLLOW-ON MAINTENANCE: Connect  servocylinder  connecting  links  (Task 11-193). Remove  safety  blocks (Task  11-29). Perform  neutral  rig  check (Task  11-33). Perform  functional  check  of  tunnel  controls  (TM 55-1520-240-T). Close  tunnel  access doors  (Task 2-2). END  OF  TASK 11-919







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.