• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALL MIXING LINKAGE CONNECTING LINKS (Continued) INSTALL  PITCH AND THRUST LEFT  OUTPUT  LINK
INSTALL  MIXING LINKAGE  CONNECTING  LINKS (Continued) - TM-55-1520-240-23-9_761

TM-55-1520-240-23-9 CH-47D Heilcopter Manual
Page Navigation
  731    732    733    734    735  736  737    738    739    740    741  
TM  55-1520-240-23-9 11-187 INSTALL  MIXING LINKAGE  CONNECTING  LINKS (Continued) 11-187 INSTALL  PITCH  AND THRUST LINK 48. Remove  nut (105), washers  (106  and  107),  and bolt  (108)  from  bellcrank  (109). FLIGHT  SAFETY PARTS This  is  an  installation  critical  flight safety part.  All aspects of its assembly and  installation  must be  ensured. Ensure  bearings  are  properly staked. Ensure  proper  attaching  hardware (impedance  type  bolt,  nut,  and washers)  is  installed  including verification  of  bolt  head  orientation, torque,  and  installation  of cotter  pins. Loose attachments within  flight control primary  linkage  will  degrade  aircraft control.   Missing  components  will cause  loss of control. 49. Position  pitch  and  thrust  link  (110) in  bellcrank (109).  Install  bolt (108),  washers (107  and  106), and  nut  (105).   Do  not  torque  nut  at  this  time. Remove  tag. 50. Remove  nut (111), washers  (112  and  113),  and bolt  (114)  from  bellcrank  (25). 51. Position  link  (110) in  bellcrank  (25).   Install  bolt (114),  washers (113  and  112), and  nut  (111).  Do not  torque  nut  at this  time. 52. Neutral  rig  first and  second  stage  linkage  (Task 11-51). 11-744







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.