TM 55-1520-240-23-8
10-56
INSTALL MAIN TANK (NO. 1 SYSTEM) FUEL LEVEL SHUTOFF VALVE
(Continued)
10-56
9.
Position manifold (18). Install eight bolts (22),
washers (23), and nuts (24).
10.
Remove plug from hose (25). Install conical seal
(25.1). Install hose on manifold (18).
11.
Position hose clamp (26). Install bolt (27), two
washers (28), and nut (29).
12.
Position gasket (30).
NOTE
Tube (17) is not symmetrical. Make
sure that the upper nut on the landing
gear mount remains accessible when
installing the tube.
13.
Maneuver tube (17), tee (31), and elbow (16) into
position on manifold (18) and fittings (19).
14.
Install four bolts (32), washers (33), and nuts
(34).
Do not use strap wrench or
overtighten ring nuts, failure of the
breakaway fittings may occur.
15.
Hand tighten four ring nuts (35) and lockwire.
Use lockwire (E231).
10-284