• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALL NO. 1  OR  NO.  2 TORQUE  SIGNAL PROCESSOR/POWER SUPPLY
FLIGHT INSTRUMENTS

TM-55-1520-240-23-7 CH-47D Heilcopter Manual
Page Navigation
  63    64    65    66    67  68  69    70    71    72    73  
TM  55-1520-240-23-7 8-22.2 INSTALL NO. 1  OR NO. 2 TORQUE SIGNAL PROCESSOR/POWER SUPPLY (Continued) 8-22.2 NOTE The  procedure  is  the  same  to  install the  No.   1  or  No.   2  torque  signal processor/power supply.  The  No.  1 torque  signal processor/power supply is  shown  here. 1. Put  on  gloves  (E184.1). 2. Clean  bonding  surfaces  of  torque  signal processor/power  supply  (1).   Use  aliphatic naphtha  (E245) and  cloths (E120). 3. Put  torque  signal  processor/power  supply  (1) over  mounting  holes  (2). 4. Install  four  screws  (3)  and  washers (4). 5. Connect  electrical  connectors  (5).   Remove paper  tags. FOLLOW-ON MAINTENANCE: Perform  an  operational  check  of  engine  torque indicating  system  (TM  55-1520-240-T). END  OF  TASK 8-71/(8-72  blank)







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.