• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ASSEMBLE  FUEL PRE-CHECK  PANEL (Continued) - TM-55-1520-240-23-7_1048
ASSEMBLE  FUEL PRE-CHECK  PANEL (Continued) - TM-55-1520-240-23-7_1050

TM-55-1520-240-23-7 CH-47D Heilcopter Manual
Page Navigation
  1009    1010    1011    1012    1013  1014  1015    1016    1017    1018    1019  
TM  55-1520-240-23-7 9-164.5 ASSEMBLE  FUEL PRE-CHECK  PANEL (Continued) 9-164.5 INSTALL  DIODE NOTE Procedure  is  similar  to  install  eight diodes. 11. Connect  diode  (23) to  terminals  (24).   Observe polarity.  Use  heat sink.  Use  solder  (E319). 12. Remove  tags. INSTALL  INDICATOR  LIGHT NOTE Procedure  is same  to  install  three indicator  lights.   Installation  of  LH REFUEL  VALVE light  is shown  here. 13. Install  lampholder (25),  washer (26),  and  nut (27).   Install  lens  cap  (28). 14. Connect  three  wires (29) by installing  two  screws (30)  and  washers  (31). 9-664







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.