TM 55-1520-240-23-7
9-157
INSTALL HOIST OPERATORS PANEL
(Continued)
9-157
4.
Position panel (2) on structure (13). Install six
screws (14).
5.
Connect electrical connector (15) to receptacle
(1).
6.
Connect cable (16) to receptacle (6).
INSPECT
FOLLOW-ON MAINTENANCE:
Install acoustical blanket (Task 2-210).
Perform operational check (TM 55-1520-240-T).
END OF TASK
9-633