TM 55-1520-240-23-6
7-250
INSTALL HOIST CONTROL VALVE
(Continued)
7-250
2.
Position valve (7) on structure with receptacle (8)
up. Install two bolts (9) and washers (10).
3.
Connect electrical plug (11) to receptacle (8).
4.
Connect tube (12) to port C1 (3). Remove tag.
5.
Connect tube (13) to port C2 (4). Remove tag.
6.
Connect tube (14) to port P (5). Remove tag.
7.
Connect tube (15) to port R (6). Remove tag.
INSPECT
FOLLOW-ON MAINTENANCE:
Service utility hydraulic system (Task 1-59 or 1-62).
Perform operational check of hoist (TM
55-1520-240-T).
Install heater compartment acoustic blanket (Task
2-210).
END OF TASK
7-926