TM 55-1520-240-23-6
7-177
TEST ACCUMULATORS (60910, HP1323100, OR AD-B130-7-177 1D390)
(AVIM)
(Continued)
7-177
GAS LEAK TEST
24.
Insert wood dowel (1) through port (2) to contact
piston of accumulator (3). Push dowel until
piston bottoms. Remove dowel.
25.
Connect resorvoir (24) to port (9).
26.
Fill reservoir (24) with fluid (E199) until tube (25)
is covered.
27.
Bleed air from block (8). Open valve (11). Use
cloths (E120) for spilled fluid.
28.
Close valve (11).
7-737