TM 55-1520-240-23-6
7-165
INSTALL PRESSURE CONTROL MODULE HIGH PRESSURE RELIEF VALVE
(Continued)
7-165
1.
Install packing (1), two packings (3), on valve (4).
2.
Install valve (4) in SYSRV port (5).
3.
Lockwire valve (4). Use lockwire (E231).
INSPECT
FOLLOW-ON MAINTENANCE:
Perform operational check (TM 55-1520-240-T).
Bleed utility hydraulic reservoir (Task 7-336).
END OF TASK
7-698