TM 55-1520-240-23-6
7-115
ASSEMBLE FLIGHT CONTROL RESERVOIR/COOLER (AVIM)
(Continued)
7-115
17.
Install manifold (26), three screws (29) and
washers (30) on reservoir (4). Torque screws to
30 inch-pounds.
18.
Lockwire screw (29). Use lockwire (E231).
19.
Install tube (31) between reservoir (4) and
manifold (26).
20.
Install two packings (32) on each transfer tube
(33).
21.
Install two transfer tubes (33) in cover (34).
22.
Position one joint (35) between cover (34) and
manifold supply tube (23). Install three screws
(36).
23.
Position other joint (35) between cover (34) and
cooler return tube (10). Install three screws (36).
24.
Torque six screws (36) to 20 inch-pounds.
Lockwire six screws. Use lockwire (E231).
FOLLOW-ON MAINTENANCE:
Test flight control reservoir/cooler (Task 7-116).
END OF TASK
7-525