TM 55-1520-240-23-6
7-34
INSTALL NO. 1 OR NO. 2 POWER CONTROL MODULE FILTER ELEMENT
(Continued)
7-34
5.
Rotate fitting (7) 90º to the left so that gage (8) is
accessible for servicing.
6.
Tighten nut (9). Torque nut to 135 inch-pounds.
7.
Check pressure gage (8). Gage shall indicate
1500 psi. If not, service accumulator (10) (Task
1-63).
FOLLOW-ON MAINTENANCE:
Bleed flight control hydraulic system (Task 7-16).
Service flight control accumulator (Task 1-63).
Perform operational check (TM 55-1520-240-T).
Close right forward work platform or install right pylon
access door (Task 2-2).
END OF TASK
7-187