TM 55-1520-240-23-6
7-321
FLUSH GROUND TEST, PUMP, HAND PUMP, AND RESERVOIR PRESSURE
TUBING
(Continued)
7-321
8.
Tag and disconnect tube (13) from tee (14).
9.
Disconnect tube (13) from port (15) of APU
START module (16). Remove tube.
10.
Disconnect tube (17) from tee (14).
11.
Connect end (18) of tube (13) to tube (17).
12.
Disconnect tube (19) from APU PRESS port (20)
of module (16).
13.
Connect hose (21) to tubes (13 and 19).
7-1155