TM 55-1520-240-23-6
7-315
FLUSH ENGINE START PRESSURE TUBING
7-315
INITIAL SETUP
Applicable Configurations:
All
Tools:
Hydraulic Repairers Tool Kit, NSN 5180-00-323-4891
Hoses
Test Stand
Container, 2 Quart
Materials:
Cloths (E135)
Personnel Required:
Aircraft Pneudraulics Repairer (2)
Inspector
Equipment Condition:
Battery Disconnected (Task 1-39)
Electrical Power Off
Hydraulic Power Off
Utility Hydraulic System Depressurized (Task 7-135.1)
Pressure Control Module Removed (Task 7-152)
Cargo Ramp Open and Level (TM 55-1520-240-T)
Right and Left Engine Lower Access Covers Open
(Task 4-49)
Filter assembly kit
ADHT6814-M9716M must be
installed in test stand pressure
line. Otherwise, system can be
contaminated.
NOTE
To operate hydraulic test stand, refer
to applicable manual.
1.
Working from ramp, connect hose (1) to RH ENG
START PRESS tube (2).
2.
Connect hose (1) to LH ENG START PRESS
tube (3).
7-1129