TM 55-1520-240-23-6
7-281
INSTALL CARGO DOOR SEQUENCE VALVE
(Continued)
7-281
3.
Position valve (3) on mount (6). Install four
washers (7) and bolts (8).
4.
Connect four tubes (9). Remove tags.
INSPECT
FOLLOW-ON MAINTENANCE:
Bleed utility hydraulic system (Task 7-339).
Perform operational check (TM 55-1520-240-T).
Adjust cargo door sequence valve (Task 7-282).
END OF TASK
7-1045