• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALL  NO.  1  DRIVE  SHAFT (Continued)
INSTALL  NO.  2 THRU  NO. 6  FORWARD  DRIVE  SHAFT

TM-55-1520-240-23-5 CH-47D Heilcopter Manual
Page Navigation
  49    50    51    52    53  54  55    56    57    58    59  
TM  55-1520-240-23-5 6-17 INSTALL NO.  1  DRIVE  SHAFT (Continued) 6-17 Rotor  blades  will  turn  when  shaft rotates.   Turning  blades  can  injure personnel.  Keep  clear  of  blades as they  turn. NOTE Install  bolt  in  mount  at  each  side of  shaft in  same  way.   Right  mount shown  here. 7. Rotate  shaft  to  align  one  of  the  bolt  holes  in adapter assembly (5) with  mount  bushing  (6). 8. Coat  thread  of  bolt  (17)  with  oil  (E254).   Install bolt  and  washer  (18) through  bolt  hole  (19)  into bushing  (6).  Use  socket  and  extension. 9. Install  washer (20)  and  nut  (21).   Torque  nut  to 150  to 160  inch-pounds. 10. Check bolt (17).  There  shall be  0.10 to 0.17 inch of bolt extending  through  nut  (21).  Install another washer (20)  or a  thinner washer  if needed. 11. Check  mount  (7)  for freedom  of  motion  on bushing  (6).  There  shall  be  no  binding. INSPECT FOLLOW-ON MAINTENANCE: Inspect  forward  drive  shaft  (Task  6-10). Install  No.   2  drive  shaft  (Task 6-18). Check rotary-wing  blade  phasing  (Task 6-27.1). Install forward  transmission  aft fairing  (Task 2-68). Close  forward  drive  shaft  tunnel  access  cover  (Task 2-2). Perform  vibration  test. END  OF  TASK 6-53







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.