TM 55-1520-240-23-4
5-133
INSTALL AFT SWASHPLATE (Continued)
5-133
5.1.
Coat bushing OD and bolt shank with antiseize
compound (E75). Do not get antiseize compound
on bolt thread.
6.
Install bolts (19), washers (20), and nuts (21) in
actuating cylinders (22 and 23). Torque nuts to
660-780 inch-pounds. Continue tightening only
as needed to align cotter pin hole. Do not exceed
1400 inch-pounds. Install cotter pins (24).
INSPECT
7.
Lower hoist chain (6).
8.
Remove guide line (7).
9.
Remove three quick-release pins (3). Remove
controls sling (T14) (1).
5-732