TM 55-1520-240-23-4
5-130
PREPARE SWASHPLATE FOR STORAGE AND SHIPMENT
(Continued)
5-130
13.1.
Pressurize container (6) as follows:
a.
Remove plug (17.1) from container. Connect
air test line (17.2) to container.
Low pressure air supply must be
used. Exceeding test pressure can
damage container.
b.
Pressurize container (6) to 3 psi max. Check
container for leaks. Container must hold 3
psi for 1 hour.
Be careful when releasing air under
pressure. Personal injury can result.
Wear goggles.
c.
Push pressure relief valve (17.3) until
pressure in container is 0 psi.
d.
Disconnect air line (17.2) from container.
Install plug (17.1).
5-720