• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALL SHOCK  ABSORBER (Continued)
ADJUST PITCH  LINK

TM-55-1520-240-23-4 CH-47D Heilcopter Manual
Page Navigation
  555    556    557    558    559  560  561    562    563    564    565  
TM  55-1520-240-23-4 5-93 INSTALL  SHOCK  ABSORBER (Continued) 5-93 Vent  valve  must  be  open  for  operation below  0ºF (-18ºC).  Valve  must  be closed  for  operation  above  30ºF (-1ºC).  Dangerous  ground  and  flight conditions  can  result  if  valve  is  in wrong  position.   At  0º  - 30ºF (-18º  - 1ºC) valve  may  be  open  or  closed. 12. If  operational  temperatures  are  0ºF (-18ºC)  or lower,  open  vent  valve  (21)  as  follows: a. Remove  lockwire.   Loosen  nut  (22)  on adjustment  screw  (23). b. Turn  screw  (23)  clockwise  to  close  valve  (21) completely.   Turn  screw  counterclockwise 1/2-turn  to  open  valve. c. Torque  nut  (22)  to 25 inch-pounds.  Lockwire nut  to  screw  (23).  Use  lockwire  (E231). 13. If  operational  temperatures  are  30ºF (-1ºC)  or higher,  close  vent  valve  (21)  as  follows: a. Repeat  step  12a. b. Turn  screw  (23)  clockwise  to  close  valve completely. c. Repeat  step  12c. FOLLOW-ON  MAINTENANCE: Remove  sling  from  blade. Remove  tiedown  lines  from  blade  over  fuseage  (Task 1-26). Close  work  platforms  (Task  2-2). END  OF  TASK 5-564







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.