TM 55-1520-240-23-3
3-26
INSTALL FORWARD LANDING GEAR TOWING SHACKLE
3-26
INITIAL SETUP
Applicable Configurations:
All
Tools:
Aircraft Mechanics Tool Kit, NSN 5180-00-323-4692
Torque Wrench, 100 to 750 Inch-Pounds
Materials:
None
Parts:
Cotter Pin
Personnel Required:
Medium Helicopter Repairer
References:
TM 55-1520-240-23P
NOTE
Procedure is same for installing left
or right forward landing gear towing
shackle. Left shackle is shown here.
1.
Place towing shackle (1) over shock strut
mounting lug (2).
2.
Install bolt (3), washer (4), and nut (5).
3.
Torque nut (5) to 480 to 600 inch-pounds.
4.
Install new cotter pin (6).
INSPECT
FOLLOW-ON MAINTENANCE:
None
END OF TASK
3-66